This is placeholder test content used to preview the blog styling. It will be replaced with real content before anything is published.
A whole-home remodel touches nearly every room, so the timeline looks different from a single-room project. Here is roughly what the process looks like from first call to move-back-in.
Phase 1: Design and planning
Expect several weeks of design work, material selections, and permitting before any demolition starts.
Phase 2: Demolition and structural work
This is the loudest, messiest phase, and also the fastest. Structural and mechanical changes happen here.
Phase 3: Finishes
Flooring, cabinetry, paint, and fixtures go in. This phase tends to take the longest because of lead times on custom materials.
- Design and permitting: 4 to 8 weeks
- Demo and structural: 2 to 4 weeks
- Finishes and punch list: 6 to 12 weeks
Every project is different, but having a realistic timeline up front makes the whole process less stressful.